US 1 Corridor Safety Modification Evaluation

The year long evaluation of the Safety Modification to US 1 between SE 10th Street and George Bush Blvd is now complete.

The Executive Summary (300 kb pdf) comprises data collected in 2007 and 2009.

The US 1 Corridor Study (3 mb pdf) presentation provides detailed information on the US 1 Safety Modification test results. 

FUNDING SOURCE
Construction costs for the permanent safety improvements are estimated to be approximately $11 million and the following funding has already been committed and/or requested:

$1,400,000     Federal Earmark with SAFETEA-LU Transportation Bill
$   750,000     Federal Enhancement Grant
$2,000,000    State Funding for SE/NE 5th Ave RRR
$2,000,000    State Funding for SE/NE 6th Ave RRR
$   350,000     Development Projects along both SE/NE 5th & 6th Ave
$4,500,000    Earmark Request from New Federal Transportation Bill
_________
$11,000,000  Total

Please note all design/engineering costs will be paid for by the Delray Beach Community Redevelopment Agency.

RRR = Resurfacing, restoration and rehabilitation 

 

 

 

Get Adobe Acrobat Reader

In order to view Adobe Acrobat Portable Document Format (PDF) files, you must have the Acrobat Reader file viewer from Adobe Systems Incorporated. To obtain your free copy, please click on the Acrobat Reader logo to the right. Acrobat and the Acrobat logo are trademarks of Adobe Systems Incorporated.