left paint middle paint right paint
Road Closure
July 4 Celebration

Dates & Times
July 4, 2018, beginning at 1:30 pm

Roadways Affected

- East Atlantic Avenue will be closed to vehicular traffic from the east side of NE/SE 7th Avenue to Ocean Blvd/SR A1A, including all side roads. 
- Ocean Blvd/SR A1A will be closed from the south side of Thomas Street to Bucida Street.
- Road closures will remain in effect until approximately 11pm.
- All southbound traffic on Ocean Blvd/SR A1A will be detoured via George Bush Blvd/NE 8th Street to US1/Federal Highway.
- All northbound traffic on Ocean Blvd/SR A1A will be detoured via Linton Blvd to US1/Federal Highway.


Name of Project
Reclaimed Water Main Expansion project (Area 12C)

Dates & Times
May 14 2018 - August 31, 2018

Roadways Affected
State Road A1A (South Ocean Boulevard) between Linton Boulevard and Casuarina Road. Lane closures including bike lane and pedestrian sidewalk closures between the hours of 7:00 am to 7:00 pm, Monday through Friday


Reason for Closure
Construction activities associated with the City of Delray Beach Reclaimed Water Main Expansion project.

Supporting Document 
- Project Map Area

- Reclaimed Water Main Project 12C
     

Name of Project
FDOT Maintenance Repair

Dates & Times
April 25, 2018 
7 pm -7 am

Roadways Affected
The I-95 northbound entrance ramp from Atlantic Avenue, in Delray Beach, will have one lane closed, along with two I-95 northbound outside lanes closed at Atlantic Avenue, Drainage structure repair.
For more information, please contact Project Manager Paul Watt at 954-380-0895.


Name of Project
Atlantic Dunes Park
     
Dates & Times
March 19, 2018 through March 23, 2018

Roadways Affected
N/AAtlantic Dunes Park will be closed to all pedestrian and vehicluar traffic for additional piling installation of new pavilion.      


Name of Project
Traffic Control Pole Repair

Dates & Times
March 7, 2018

Roadways Affected
SE 1st Street (East of Swinton Ave)

Reason for Closure
Contractors make repairs to the mast arm of a traffic control pole. Traffic on Swinton Ave will be directed to one lane.      

Name of Project
Seacrest Beautification Phase I

Dates & Times
May 21, 2018

Roadways Affected
NE 2nd Avenue at George Bush Blvd.NE 2nd Ave. will be CLOSED at George Bush Blvd beggining May 21st, 2018 for the remainder of the project until the Paving of the roadway is completed.
bottom icon1 bottom icon2 bottom icon3 bottom icon4 bottom icon5 6 bottom icon7 8 bottom icon9 bottom icon10 bottom icon11